Edinburgh Maintenance Delivery Unit (MDU) Refurbishment

Network Rail

arrow leftarrow right
STATISTICS

LOCATION

Edinburgh

DURATION

24 Weeks

VALUE

£2.5m

This project involved the upgrade and refurbishment of an existing steel portal framed shed and single-storey extension.

As part of the refurbishment we delivered a complex mechanical and electrical services package, including:

  • HVAC installation and AHU
  • Building Management System
  • Smoke Control
  • Relocation of gas supply pipework
  • Installation of a new MCCB switchboard
  • Small Power
  • Lighting including controls, emergency lighting, and external lighting
  • Telephone/data installation
  • Security Installations
  • Disabled WC Alarm
  • Fire Detection and Alarm System Installation
  • Emergency Voice Communication system
  • Induction Loop

Early engagement via a design and build procurement route ensured we worked effectively with the Network Rail Design Team and the appointed services engineers, KJ Tait.

The first of its type, the Edinburgh MDU has helped to reinstate a previously lost sense of pride in the workforce and has set a benchmark for all further MDUs within Network Rail. This project won the 2017 BCO Scottish Regional Award for Innovation. The project incorporated innovative design with construction techniques aimed at delivering a high-quality refurbishment to a BREEAM ‘good’ rating.

OUR WORK
  • M&E Works

    M&E Works

    Britvic

    READ MORE
  • M&E Contractor

    M&E Contractor

    Warburtons

    READ MORE
  • BT Murrayfield Stadium

    BT Murrayfield Stadium

    Scottish Rugby Union

    READ MORE
  • Tynecastle Stadium New Main Stand

    Tynecastle Stadium New Main Stand

    Hearts of Midlothian FC

    READ MORE
  • Full M&E Service

    Full M&E Service

    Costco

    READ MORE
  • Royal Forest Factory M&E Works

    Royal Forest Factory M&E Works

    Lucozade Ribena Suntory

    READ MORE
  • Elegance 2 Development

    Elegance 2 Development

    Strata Homes

    READ MORE
  • M&E Works for 10 Edinburgh Schools

    M&E Works for 10 Edinburgh Schools

    City of Edinburgh Council

    READ MORE
  • Farnborough Branch Refurbishment

    Farnborough Branch Refurbishment

    Holt's & NatWest

    READ MORE
  • Queen Elizabeth University Hospital Chlorine Dioxide Dosing

    Queen Elizabeth University Hospital Chlorine Dioxide Dosing

    NHS Greater Glasgow and Clyde

    READ MORE
  • Queen Elizabeth University Hospital Negative Pressure Isolation Rooms

    Queen Elizabeth University Hospital Negative Pressure Isolation Rooms

    NHS Greater Glasgow and Clyde

    READ MORE
  • Thomas Graham Building Ventilation Works

    Thomas Graham Building Ventilation Works

    The University of Strathclyde

    READ MORE