Queen Elizabeth University Hospital Chlorine Dioxide Dosing

NHS Greater Glasgow and Clyde

arrow leftarrow right
STATISTICS

LOCATION

Glasgow

DURATION

41 Weeks

VALUE

£1m

Design and installation of a chlorine dioxide treatment system to control waterborne pathogens within the hospital under the requirements of HTM04-01 and ACOP L8.

The latest in equipment monitoring capabilities were installed to provide a clear audit trail and show due diligence for public accountability.


To get treatment into the building water supply, in-tank dosing was used, with further chlorine dioxide dosing points installed on the hot water service return and cold water system for each heat station in plantrooms.


Each chlorine dosing location was designed to deliver and monitor chlorine dioxide dosing levels via a BMS interface. Each location has remote telemetry with the ability to produce a weekly report detailing chlorine dioxide and chlorite levels.


Pipework modifications were carried out and a water meter added to the filtration. New expansions vessels were phased in with the dosing system.
The chlorine dioxide generators and chemical storage are protected by chlorine dioxide gas alarms linked to the BMS and telemetry and activated plant auto shut off function.


Training was provided to board designated employees responsible for the day to day management of the systems. The installation met all statutory and regulatory requirements.

OUR WORK
  • M&E Works

    M&E Works

    Britvic

    READ MORE
  • M&E Contractor

    M&E Contractor

    Warburtons

    READ MORE
  • BT Murrayfield Stadium

    BT Murrayfield Stadium

    Scottish Rugby Union

    READ MORE
  • Tynecastle Stadium New Main Stand

    Tynecastle Stadium New Main Stand

    Hearts of Midlothian FC

    READ MORE
  • Full M&E Service

    Full M&E Service

    Costco

    READ MORE
  • Royal Forest Factory M&E Works

    Royal Forest Factory M&E Works

    Lucozade Ribena Suntory

    READ MORE
  • Elegance 2 Development

    Elegance 2 Development

    Strata Homes

    READ MORE
  • M&E Works for 10 Edinburgh Schools

    M&E Works for 10 Edinburgh Schools

    City of Edinburgh Council

    READ MORE
  • Farnborough Branch Refurbishment

    Farnborough Branch Refurbishment

    Holt's & NatWest

    READ MORE
  • Edinburgh Maintenance Delivery Unit (MDU) Refurbishment

    Edinburgh Maintenance Delivery Unit (MDU) Refurbishment

    Network Rail

    READ MORE
  • Queen Elizabeth University Hospital Negative Pressure Isolation Rooms

    Queen Elizabeth University Hospital Negative Pressure Isolation Rooms

    NHS Greater Glasgow and Clyde

    READ MORE
  • Thomas Graham Building Ventilation Works

    Thomas Graham Building Ventilation Works

    The University of Strathclyde

    READ MORE